Wet rooms in Limerick

The floor is the shower tray. Here's what that takes, what it costs and what can go wrong.

Get a free quote

Free, no obligation. One local company prices it, not five.

  • €5,000 to €10,000a standard wet room
  • €16,000 to €30,000+a large, high-spec wet room
  • Up to €40,000Housing Adaptation Grant, where it's for a disability
  • No stepa level floor from door to drain
A shower room with large grey tiles, a glass screen, a wall-hung toilet and a vessel basin

Wet rooms in Limerick: the short answer

A wet room in Limerick costs €5,000 to €10,000, or €16,000 to €30,000+ for a large one with premium tiles and underfloor heating. It takes 10 to 14 working days. The whole floor is tanked and laid to fall to a drain, so the shower has no tray and no step.

The floor is the shower tray

  • The fall: the floor slopes gently to the drain, so water never reaches the door.
  • Tanking: a waterproof membrane over the whole floor and up the walls.
  • The drain: a linear channel along a wall or a square gully in the floor.
  • The floor: on a concrete ground floor the screed is laid to the fall; upstairs, the timber joists are strengthened and overlaid.

What puts a wet room at the top of the range

  • Moving the drain or the toilet: €1,200 to €2,500 in pipework.
  • Large porcelain tiles, which take longer to lay to a fall.
  • Underfloor heating, €500 to €1,500, which also dries the floor faster.
  • A timber floor upstairs that needs strengthening.

Get a price for your bathroom in 4 taps

Tap what you need and leave your number. It goes to one bathroom renovation company that covers your part of Limerick, and they ring you back to see the room and give you a written price.

What's the job?

Pick the closest. They'll ask the rest.

By sending, you agree to Bathroom Renovations Limerick passing your details to one bathroom renovation company that covers your part of Limerick, so they can contact you about the job. Privacy notice

Step 1 of 3

Questions people ask us

How much is a wet room in Limerick?

€5,000 to €10,000 for a standard wet room, and €16,000 to €30,000+ for a large one with premium tiles and underfloor heating.

Can a wet room go upstairs?

Usually, yes. On a timber floor the joists are strengthened and overlaid to make the fall to the drain, and the whole floor is tanked. The company needs to see the floor first.

How long does a wet room take?

10 to 14 working days. Tanking has to cure before tiling, so there are days with nobody on site.

Do wet rooms leak?

Not when the tanking is done right: a membrane over the whole floor and up the walls, with the joints taped. Ask what system they use and whether it's guaranteed.

Is a wet room grant-aided?

A level-access shower for someone with a disability can be, under the Housing Adaptation Grant, up to €40,000, from Limerick City and County Council.

Bathroom renovation across Co. Limerick

One local company covers Co. Limerick — including Limerick City, Castletroy, Adare, Dooradoyle, Raheen and every surrounding town and suburb. Pick your area below for local prices, specifications and advice. Compare all areas covered →

Get a free price for your bathroom in Limerick

Four taps, or a photo. One local company rings you with a written price.

Get a free quote